Official Zitrón distributors in Argentina: 60 years building ventilation for underground mining, with projects in more than 80 countries.

years of history
0
subsidiaries worldwide
0
countries with projects
0 +

Spanish technology, Argentine support.

Cuatro Fincas S.A. does business as Green Bulk. We supply industrial equipment and technical solutions for mining, oil & gas, infrastructure and agribusiness.

We work with top-tier manufacturers and provide technical support here, adapted to the way operations run in Argentina. With Zitrón, a world leader in underground mining ventilation, we add a new line to our portfolio, alongside Jain Irrigation.

What we solve in underground mining

Primary and secondary ventilation

Axial fans and jet fans for the main circuit and the development headings.

Ventilation on demand (VOD)

Variable frequency drives and automatic control to move the air the mine needs at every moment.

Silencers, ducting and accessories

To cut noise and deliver airflow to the face with the lowest possible loss.

Water and fluid handling

Pumping and water conveyance underground, quoted within the same project.

Zitrón product line

Every unit is designed for the tunnel, mine or site where it will operate.

Road and rail tunnels

Longitudinal and emergency ventilation for roads, metro and rail.

Mine ventilation

Primary and secondary circuits, underground, on surface and at the plant.

Jet fans

Jet fans for large cross-section tunnels.

Axial fans

High flow and pressure for long, large-diameter ducts.

Temporary ventilation

Mobile units for the construction and tunnelling stage.

Wind tunnels

Test rigs for aerodynamic testing.

Marine ventilation

Air renewal in holds and enclosed spaces on ships.

Not sure which equipment you need?

Tell us about the project and we will size it together with Zitrón's engineering team.

Turnkey, from design to commissioning

1

Design

Engineering and sizing for your project.

2

Manufacturing

At Zitrón's plant in Gijón, Spain.

3

Packaging

Prepared for international shipping.

4

Import

Green Bulk handles customs clearance and logistics all the way to your operation.

5

Installation

On-site assembly with local technical support.

6

Commissioning

Performance testing and handover of the equipment up and running.

Every design is tested before it is built

In Gijón, Zitrón runs the world's largest fan test facility, in operation since 2004.

CFD simulation

Airflow is modelled before manufacturing.

Bench testing

Every unit is tested on Zitrón's own test bench.

Dimensional control

Every critical component is measured and checked.

Fire resistance

Equipment built for fire scenarios and high temperatures.

Why work with Green Bulk

Official representation

We represent Zitrón and Jain Irrigation in Argentina.

Technical advice

We help you choose and size the equipment from the specification stage.

Support

We follow the project from engineering through after-sales.

Import and logistics

We bring the equipment from abroad and deliver it to your operation.

Let's talk about your project

Tell us what kind of project it is and the conditions it operates in. With that, we will recommend the right Zitrón equipment.